Extended Winding Solutions

Case study

Rotor production line

Process & operations

  • Operator station (circlip insertion, bell loading, evacuation NOK)
  • Automatic axis press
  • Radial axis control
  • Activator application and control (drying 5 min)
  • Magnet positioning
  • Glue application on magnets
  • Magnet position control, ejection NOK
  • Drying glue (20 min)
  • Balancing assembly
  • Glue resistance test
  • Laser marking

Process data

Cycle time
20 sec
Operators
1
Product
Rotor
Country
Turkey
Rotor production line

A similar project in mind?

Contact us