Case study · Energy – electrical equipment

Connected circuit breaker: 9 functional tests on a 20 m² line, delivered in 6 months

  • 20 s

    takt time per product

  • −30%

    floor space vs. the previous robotic solution

  • 80%

    of the machine is reusable

  • 6 months

    project lead time

Background

A European leader in electrical equipment is industrializing a new connected circuit breaker in France. Each product undergoes nine functional tests before packaging, at a rate of one part every 20 seconds, on two 8-hour shifts.

Challenges

Chain nine tests together without multiplying robots and conveyors, fit within a small footprint, and launch series production in 2025 on a tight schedule.

The OSE Solution

A PROLYNK line: 15 autonomous mobile robots carry each product from station to station, between manual workstations, test benches, and packaging. An automatic battery changer keeps the line running continuously.

PROLYNK line layout (simulation)
PROLYNK line layout (simulation)
Connected circuit breaker: 9 functional tests on a 20 m² line, delivered in 6 months